How to handle with indirect positions

Wall corner & floor:

+ Clean the surface

+ Cover the corner by Activ-Latex

+ Put the mesh reinforcement

 viTriOngXuyenSanTuong-259x300_anh

The tube cross the floor and walls

+ Clean the tube placement

+ don’t let Active-Grout inserted into the gap between the pipe and the floor.

+ Conduct to Activ – PU Flex Construction (thick : 2cm)

xuLyViTriTiepGiap-300x269_anh

 

If you enjoyed this post, please consider leaving a comment or subscribing to the RSS feed to have future articles delivered to your feed reader.

Leave a Reply

Your email address will not be published. Required fields are marked *