Popular Execution waterproofing Process

Step 1 : Prepare the surface ( clean the dust, the adhesive to protect the surface cleanly before doing)

Step 2 :  Resolve some positons, low point positons ( the crack, mini hole, defected concrete….)

Step 3 : Moisten the surface by water

Step 4 : Construction

Step 5 : Examination then everything have done.